PMI-PBA Exam Content: The 5 Domains and 28 Tasks
The PMI-PBA exam format (200 questions in 240 minutes), the weights of the five domains, the 28 tasks, and a note that the published outline dates from the 2013 study.
- Questions and time
- 200 questions · 240 minutes
- Pass mark
- PMI does not publish a numeric pass mark; the passing score is set for each exam by psychometric analysis
- Exam fee
- USD 405 for PMI members, USD 555 for non-members
Start with 10 free questions to find what needs more work. No sign-up, with answer explanations.
Try 10 free questions and see your levelPut what you just read into practice
Start with 10 free questions to find what needs more work. No sign-up, with answer explanations.
Try 10 free questions and see your levelLast checked: 15 November 2026. Check the PMI-PBA Exam Content Outline and the certification page on PMI's website before you start.
The PMI-PBA exam tests how you work as a business analyst: defining the problem, eliciting and analyzing requirements, tracing them through delivery, then evaluating the solution. Most questions describe a practical situation and ask for the best next step.
Exam format at a glance
| Item | Details |
|---|---|
| Questions | 200, of which 175 are scored and 25 are unscored pretest questions spread across the domains |
| Time | 240 minutes |
| Question type | Multiple choice |
| Language | English and Simplified Chinese; there is no Arabic version |
| Pass mark | PMI does not publish a number; the passing score is set for each exam by psychometric analysis |
Weights of the five domains
| Domain | Weight | Approx. questions out of 200 |
|---|---|---|
| Needs Assessment | 18% | about 36 |
| Planning | 22% | about 44 |
| Analysis | 35% | about 70 |
| Traceability and Monitoring | 15% | about 30 |
| Evaluation | 10% | about 20 |
Analysis is the largest domain at 35%, almost twice the weight of Needs Assessment. Traceability and Monitoring is 15% and Evaluation 10%. The weights come from the content outline, and the 25 pretest questions are spread across the domains in the same proportions.
The 28 tasks
| Domain | Task | Name |
|---|---|---|
| Needs Assessment | 1 | Define the business problem or opportunity |
| Needs Assessment | 2 | Gather and analyze information to determine value proposition |
| Needs Assessment | 3 | Help develop project goals and objectives |
| Needs Assessment | 4 | Identify stakeholders |
| Needs Assessment | 5 | Determine stakeholder values |
| Planning | 1 | Review the business case, goals and objectives |
| Planning | 2 | Define the requirements traceability strategy |
| Planning | 3 | Develop the requirements management plan |
| Planning | 4 | Select requirements change control methods |
| Planning | 5 | Select document control methods |
| Planning | 6 | Define business metrics and acceptance criteria |
| Analysis | 1 | Elicit or identify requirements |
| Analysis | 2 | Analyze, decompose and elaborate requirements |
| Analysis | 3 | Evaluate product options and capabilities |
| Analysis | 4 | Allocate accepted or deferred requirements |
| Analysis | 5 | Obtain sign-off on the requirements baseline |
| Analysis | 6 | Write requirements specifications |
| Analysis | 7 | Validate requirements |
| Analysis | 8 | Elaborate detailed metrics and acceptance criteria |
| Traceability and Monitoring | 1 | Track requirements |
| Traceability and Monitoring | 2 | Monitor requirements through their lifecycle |
| Traceability and Monitoring | 3 | Update requirement status |
| Traceability and Monitoring | 4 | Communicate requirements status |
| Traceability and Monitoring | 5 | Manage changes to requirements |
| Evaluation | 1 | Validate test results against acceptance criteria |
| Evaluation | 2 | Analyze and communicate solution gaps |
| Evaluation | 3 | Obtain stakeholder sign-off on the solution |
| Evaluation | 4 | Evaluate the deployed solution |
A note on the outline version
The outline published on PMI's site comes from the 2013 role delineation study (printed July 2017), and no newer version exists. Its five domains and weights are the ones the certification page lists today. The task names above are our own wording, not PMI's text.
This is an independent website with no connection to the Project Management Institute (PMI). "PMI" and "PMI-PBA" are registered marks of the Project Management Institute.
Finished reading? Try a set of questions
Start with 10 free questions to find your weakest units. Keep practising with the full question bank and mock exams from SAR 26.
Put the plan to work here
SAR 34 $9
One purchase · lifetime access · review guide included
- 542 questions, every option explained with its source
- Full mock exams: 200 questions in 240 minutes, like the real one
- Practice that starts with your weakest units, plus a review of your mistakes
See everything included
Full mock exams like the real one and 542 explained questions that find your weak spots and train them
- Unlimited full mock exams to practise your pace and check your performance across the whole exam
- Practise 10 weak-area questions, starting where you lose the most marks
- 542 questions explaining why every option is right or wrong
- Arabic and English with one pass
- Unit notes and flashcards, then questions to check your understanding
You get 3 attempts within your one-year eligibility period; if you do not pass in them, you wait a full year from the last attempt before you can apply again. Source Last verified: 2026-11-15