01Present worth of $3,000 received at the end of each year for 12 years at 8%?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Engineering Economics – IE-T1-01..03 Fundamentals, cost types, depreciation, worth analysis & discounted cash flows
02Machine A: fixed $20,000/yr, $8/unit. Machine B: fixed $50,000/yr, $5/unit. Annual volume where costs are equal?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Engineering Economics – IE-T1-04..05 Alternatives, replacement, payback, breakeven, taxes, inflation, risk
03How many ordered ways can 1st, 2nd, and 3rd prizes go to 8 contestants?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Probability and Statistics – IE-T2-01..02 Probability, distributions, descriptive statistics, estimation, CIs
04Defects by shift: 18, 22, 30, 30 (expected 25 each). Chi-square statistic?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Probability and Statistics – IE-T2-03..06 Hypothesis tests, ANOVA, regression, factorial designs/DOE
05Maximize Z = 3x + 5y subject to x ≤ 4, 2y ≤ 12, 3x + 2y ≤ 18, x, y ≥ 0. Optimal Z?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Modeling and Computation – IE-T3-01,03,04 LP/IP, transportation, dynamic programming, sensitivity, MST/shortest path/max flow
06Activities: A (3 d), B (4 d), C (2 d, after A), D (5 d, after A and B), E (3 d, after C and D). Project duration?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Industrial Management – IE-T4-02 Project management: CPM, PERT, crashing, cost/time control
07Task times 4, 3, 5, 2, 6, 4 min and cycle time 8 min. Theoretical minimum number of stations?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Manufacturing and Production Systems – IE-T5-01..03,05..07 Materials & processes, integrated/lean/cellular systems, automation, CNC/robotics, DFM, line balancing
08Flows: A–B 20, A–C 10, B–C 30 trips/day; distances A–B 2, A–C 4, B–C 1. Total load–distance?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Facilities and Logistics – IE-T6-01..03,06 Location factors, layout types, CAD layout, distance metrics, evaluating locations
09Normal time 2.2 min with 15% PF&D allowance (applied to normal time). Standard time?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Human Factors, Productivity, Ergonomics, and Work Design – IE-T7-02 Work measurement: time study, work sampling, standards, learning curves
10X̄–R chart, n = 5: grand mean 50.0, R̄ = 4.0, A₂ = 0.577. Upper control limit for X̄?
Reference: SCE–Qiyas Engineering Fundamentals – Industrial, Quality Engineering – IE-T8-04 Statistical quality control: control charts, capability, sampling